Hailing Manor High School_1

Hailing Manor High School_3

Hailing Manor High School_4

Hailing Manor High School_5

Mezzanine Floor for School in South Croydon

A Vanguard case study

 

Providing their students with a top rate education, their spectacular new and refurbished buildings, match their aspirations for an Academy that brings learning alive.

Vanguard Contracts installed a mezzanine floor over half of the main hall including fire protection to the underside of the mezzanine floor using a 600 x 600mm suspended ceiling, handrail to the open edge of the floor and an access staircase with balustrade.

The project was installed by a fully CRB checked team on time and within budget.

  • Location: South Croydon
  • Duration: 2 weeks
  • Value: £45k
  • Sector:

More case studies:

All case studies Portfolio